top of page

Glynn County Engineering Services

Engineering Intern

Brunswick, Georgia, USA

May 2009-July 2009

Responsibilities included but were not limited to:

 

  • Performing water quality screenings on 15+ local point sources with outfalls to local streams and marshes

  • Gathering, producing, and organizing required material for NPDES annual report

  • Reviewing 5 site drawings and identifying water quality features of residential subdivisions and commercial plazas for future inspection. 

  • Producing stormwater educational material for the community (sample below)

 

Site Visits:

 

  • Roadway Project on St. Simons Island

  • Paving Projects

  • Waste Water Treatment Plant

Visit to Waste Water Treatment Plant

bottom of page